EPA rules for remodelers in Texas
The firm needs EPA certification and a certified renovator on the job. A remodeler does not need a DSHS abatement license, because EPA runs RRP in Texas. Before work starts, and no more than 60 days ahead, we give you EPA’s Renovate Right pamphlet. We either get a written acknowledgment from you or mail it at least 7 days before work starts and keep the certificate of mailing. If the owner does not live in the house, an adult tenant gets one too.
Small jobs get a pass. Disturbing six square feet or less of paint per room indoors, or 20 square feet or less outdoors, counts as minor repair. The pass never covers window replacement, tearing out painted surfaces or the banned practices above.
When a remodel becomes an abatement project
The two programs are split by purpose. Abatement sets out to remove lead hazards, whether a government agency orders it or you choose it. RRP work disturbs paint for some other reason, like a remodel, and is not meant to deal with lead hazards. If the point of stripping trim or replacing windows is to get rid of the lead, the job is abatement. That takes a DSHS-certified abatement firm, notice to DSHS at least seven working days ahead, and everyone out of the house while the work goes on. If you want the lead gone as part of the remodel, settle that before you sign anything.
Haven’t tested the paint yet? Start with lead paint inspection and risk assessment. When the remodel is done, lead dust cleanup and clearance testing can show the rooms are clean before furniture and family move back in. For other jobs, see the rest of our lead paint work.