Cedar Park Lead Paint Removal works on Lakeway houses built before 1978, from testing and inspection to abatement, encapsulation, lead-safe remodels and exterior trim. The build year and the surfaces involved shape what comes next: a test report, a sealed coating, stripping or new parts.
Roughly one home in seven in Lakeway dates from before 1980. That is a bigger share than in Cedar Park or Leander.
Single-story 1960s house from Lakeway’s first years, with a covered front porch
Original request
Repaint the outside, where the white trim is peeling
Testing
Lead paint on the window sills and trim, porch posts and railing; none on the green siding
Surfaces
Window sills and trim, porch posts and railing, fascia and eaves, plus the siding
Work
Wet scraping, sanding with HEPA-fitted tools, primer and two coats
Timeline
Six to eight working days, avoiding wind and the hottest afternoons
Cost
$8,600
In this example, the owners of a 1960s house from Lakeway’s first years plan to repaint the outside, and the white trim is peeling to bare wood on the window sills. Because the house was built before 1978, the trim, siding, posts and railing are tested first. Lead paint shows up on the trim, posts and railing, but not on the green siding.
Houses followed the resort hotel, which opened in July 1963, and most of the older ones date from the 1970s. The 1970s fall on both sides of the 1978 cutoff, so a Lakeway house from 1975 and one from 1979 can face different rules for the same remodel. Before anything else we confirm the year, and that is where lead paint inspection and risk assessment comes in.
Exterior paint on lakeside homes
Painted fascia, soffits and wood trim on early lake homes get the same long hot season as the rest of the Austin area, and peeling paint from them lands on landscaped yards and slopes. On a pre-1978 house we lay plastic ground cover around the work area and pick up chips before they reach beds or drainage paths. Whether a part is stripped, replaced or sealed depends on its condition. See exterior lead paint removal for how we choose between them.
Inspection before remodeling
Before you renovate a 1960s or 1970s Lakeway home, a DSHS-certified inspector or risk assessor can test the trim, walls and windows the plans will disturb. Parts found free of lead-based paint drop out of EPA’s renovation rule, which can reduce the containment a remodel needs. Without results, the rule treats the paint as lead-based. If the plans go ahead, we handle the work as lead-safe remodeling.
Encapsulation and removal
Intact paint on walls or trim can be sealed with an encapsulant coating or covered with new drywall or cladding. That avoids stripping, but the lead stays in the house and future owners need to know about it. Paint that is peeling, or on surfaces that rub, like window sashes and door edges, is better removed or replaced. For the sealing and covering options, see lead paint encapsulation and enclosure.
Older housing in Lakeway
Lakeway started as a resort community on Lake Travis in 1962, so its oldest houses date from the 1960s and 1970s.
If you sell or lease a house built before 1978, federal law makes you give the EPA pamphlet to the buyer or tenant, tell them about any known lead-based paint and reports, add the Lead Warning Statement to the contract, and keep the records for three years. Leases of 100 days or less are exempt, which can cover short seasonal rentals. Housing a certified inspector has declared lead-free is exempt too, so an inspection before you list can settle the question for later sales as well.
Lakeway is in Travis County, about 16 miles west of Austin. Replacing windows, siding or trim on your house may need a city permit, so ask the city before you start, and check with any owners’ association that reviews exterior changes. Those approvals come on top of the EPA and DSHS requirements, not in place of them.
Homes built before 1978 may contain lead-based paint, and in Texas they are treated as if they do unless tested. The age doesn’t tell you which surfaces have it, because later repainting, replacement trim and remodels all change the picture. A lead inspection shows which parts test positive.
Does Travis County help with lead paint costs in Lakeway?
Lakeway is in the service area of Travis County’s CDBG Home Rehabilitation Program for owner-occupants, but the program does not mention lead paint, so ask the county office at 512-854-3460 whether it covers lead work. The county’s lead-poisoning prevention page is for education, not funding.
Who regulates renovation in older homes?
Remodeling, repair and painting in pre-1978 homes fall under the EPA, which runs its RRP rule directly in Texas. Lead inspections, risk assessments and abatement fall under the Texas Department of State Health Services. Which one applies depends on what the project is for.
Leander sits closer to Cedar Park and has much newer housing. If your home is in Old Town or the subdivisions around it, see lead paint removal in Leander.
Request a free lead paint removal quote
Which Lakeway street is the house on, roughly when was it built, and what are you hoping to change or check? A sentence on each is plenty. We'll get back to you soon with an estimate or any questions we have. Estimates are free and there's no obligation.